Varanger Kraft Hydrogen Control System
Varanger Kraft Hydrogen is a 2.5 MW facility located at Berlevågen, with a production capacity of 1 tonn hydrogen per day. The plant has been in operation from 2020, but will be fully commercialised from Q1 2024. HYDS will deliver the control system to Varanger Kraft Hydrogen.
![](https://i0.wp.com/hydrogensolutions.no/wp-content/uploads/2023/11/Hydrogen-Berlevåg22.jpg.webp?resize=800%2C379&ssl=1)